Real RAT Work jobs: what the site needed, how we did it, and how it went.

Rope access glass survey of a damaged atrium roof
Two cracked units in a 10th-floor atrium roof, surveyed and measured on rope in a single day, so the glazing contractor could order exact replacements.
Read the case study
Rope access and rescue cover at a COMAH gas terminal
Cable installation across congested pipe-racks at a live, top-tier COMAH terminal, with our own rescue team on standby throughout.
Read the case study
Gutter clearance and solar panel cleaning at a defence logistics hub
Hundreds of metres of choked gutters cleared and a rooftop solar array washed, all from the roof, while the secure yard below kept running.
Read the case studyEmergency cable pulling at an energy-from-waste plant
Called in at a few hours’ notice to rig and pull heavy power cable through a live plant, after ground access equipment couldn’t reach the route.
Read the case study
Tell us about the job.
The quickest way is a call. Speak to the team directly, and planned work is quoted within 24 hours.
07724 093140phellan@ratwork.co.ukNationwide: England, Scotland, Wales and Northern Ireland