- Site
- Grade I listed country house
- Location
- Shropshire
- Work
- Phase 1 weatherproofing: roof leadwork and rainwater goods
- Team
- IRATA team led by a Level 3 safety supervisor
- Dates
- 7 to 8 November 2026
The job
Lead flashing had lifted on the roof of a Grade I listed country house, and the building needed to be watertight before winter. Phase 1 was a two-day visit on rope, so the repairs could go ahead without waiting for a scaffold.
What we did
- Wrote the RAMS for the job, with a rescue plan in place before anyone went over the edge.
- Surveyed the leadwork, parapet gutters, roof pitches, valleys and abutments for splits, slipped sections and places water could get in.
- Reseated and refixed lifted lead flashing with lead hall clips, copper nails and lead sealant, then dressed the lead back down by hand.
- Cleared debris, silt and vegetation from the rainwater hoppers, outlets and downpipe heads, and checked they drained freely.
- Tethered every tool and briefed the team on protecting the historic fabric.
The result
Phase 1 is complete, and the client gave us good feedback on the work.
See our conservation and heritage service.