The access problem
Cranes need road space and permits. Scaffold takes time to plan and put up. Boom lifts need clear, firm ground. On city-centre buildings, heritage sites and tight sites, that can stop a cable job before it starts. Rope access doesn’t need any of it.
Temporary engineered rigging
Pulling heavy cable through changes of level creates friction and snatch loads that can damage the cable sheath or overload the steel. We design the rigging for the load before the pull: non-destructive anchors on existing steelwork, rigging plates, progress-capture pulleys and high-load rollers, with deviations to keep the cable clear of hot plant and above its minimum bend radius.
- Mechanical advantage hauling systems, with the pull rate controlled from start to finish
- Directional rigging and deviations around pipe-racks, conduits and structural dead ends
- Nothing drilled or welded: the structure is left as we found it
- Cable dressed into ladder and tray, cleated and torqued to the engineer’s specification

See it on site: emergency cable pulling at an energy-from-waste plant and cable runs across live pipe-racks at a COMAH terminal.
What we install
- Heavy power cabling across plant rooms, pipe-racks and gantries
- Fibre runs on existing buildings and structures
- Telecoms cabling and upgrades on existing installations
- Power cable runs at height
- Backbone cabling through hard-to-reach routes on large buildings

Why rope access for cable work
- No ground equipment and minimal disruption to the site or neighbours
- Suits listed buildings and conservation areas
- Handles tall buildings, corners and complicated routes
- Every job supervised by an IRATA Level 3 technician, with a full compliance pack




